Page 29 - NIS English 01-15 February, 2025
P. 29

COVER STORY
                                                                      RAILWAYS' TRANSFORMATION
                ANJI KHAD BRIDGE AND CHENAB ARE                      RAILWAY PROJECTS WORTH MORE

              UNMATCHED EXAMPLES OF ENGINEERING                      THAN RS 70,000 CRORE UNDERWAY
                                                                     IN ODISHA
        Anji Khad Bridge: It is the first cable-based bridge of Indian
                                                                     PM Narendra Modi laid the foundation stone
        Railways. It uses 96 cables weighing 849 metric tons. Anji
                                                                     of the Raigarh Railway Division in Odisha on
        Bridge has been constructed in the Reasi district of Jammu
                                                                     January 6, 2025. While this will strengthen the
        and Kashmir under the most challenging Udhampur-
                                                                     railway infrastructure of the state, it will also
                                     Srinagar-Baramulla rail link
                                                                     boost tourism, business, and employment in
                                     project of Indian Railways.
                                                                     South Odisha. This is the region where a large
                                     This bridge is situated in the
                                                                     number of tribals live. Odisha has abundant
                                     Himalayan hills which is a
                                                                     natural resources and a vast coastline.
                                     region of rugged hills and
                                                                     Due to this, there is a lot of potential for
                                     natural complexities and
                                                                     international trade here. Several railway
                                     prone to earthquakes. The
                                                                     projects worth more than Rs 70,000 crore are
                                     length of this bridge is 725.5
                                                                     underway in the state.
                                     meters. The main bridge
                                     over Anji Khad is a cable-
                                                                     NEW TERMINAL STATION INAUGURATED
                                     stayed bridge with a total
        length of 473.25 meters with a main span of 290 meters. Anji   AT CHARLAPALLI, TELANGANA
        Khad Bridge connects tunnels T-2 and T-3 on the Katra-
        Banihal section of the Udhampur-Srinagar-Baramulla Rail      PM Narendra Modi inaugurated the
        Link Project. Anji Khad bridge has a main pylon 193 meters   Charlapalli new terminal station in
        high from the top of the foundation which is situated at     Telangana. The terminal station has been
        a height of 331 meters from the river bed. This bridge is    built at a cost of about Rs 413 crore. This
        designed to withstand heavy storms blowing at a speed of     terminal will promote regional development
        213 kmph. Even if 40 kg of explosives are detonated on its   by connecting to the Outer Ring Road. This
        deck, the bridge will not be damaged.                        station, connected to the Outer Ring Road,
                                                                     will greatly promote development in the
        Chenab Bridge: The construction of an arch bridge over the   region. Modern facilities like lifts, escalators,
        Chenab River in the Reasi district of Jammu and Kashmir has   and solar panels are available on the
        been completed, which is the world's highest railway bridge.   platform of the station. The new terminal will
        Its construction cost Rs 1,486 crore. The length of the bridge   reduce congestion pressure on the existing
        is 1315 meters and the height of the bridge from the river bed   stations of Secunderabad, Hyderabad, and
        is 359 meters. The design period of the bridge is 120 years.   Kacheguda, thereby making travel more
        28,660 metric tons of steel have been used in the construction   convenient for people.
        of the bridge. Even if the wind blows at a speed of 266
        kilometers per hour, there will be no damage to the bridge or
        any problem in the movement of trains.

























                                                                       NEW INDIA SAMACHAR  | February 1-15, 2025 27
   24   25   26   27   28   29   30   31   32   33   34