Page 37 - NIS English 01-15 September, 2026
P. 37

Union Cabinet Decisions

                    Approval for Guwahati-Tezpur

              Highway and GOBARdhan  Scheme



             To enhance connectivity in the North-East and strengthen the country’s infrastructure, the
              Union Cabinet has approved the development of the 135.87 km long, four-lane Guwahati-
           Tezpur corridor in Assam. Also, the ‘GOBARdhan ‘ scheme has been approved to strengthen the
           energy sector and boost biogas production in India. These two decisions will not only accelerate
            connectivity in the North-East but also increase farmers’ income and bolster energy security.


        DECISION: Approval for GOBARdhan, a national         DECISION: Cabinet has approved the construction
        integrated scheme for Compressed Biogas, with        of a 4-lane highway from Baihata Chariali (near
        an outlay of ₹23,731 crore.                          Guwahati, Assam) to Tezpur along  National
                                                             Highway-15,  excluding  the  15.11  km  Mangaldai
        IMPACT:  A historic  national scheme  to  transform   bypass.
        the country’s organic resources into clean energy,   IMPACT: The project  will approximately  double
        rural prosperity, and economic growth. The scheme    average travel speeds, halve travel time, and improve
        will be implemented from the financial year 2026-27   overall road safety. It will reduce fuel consumption
        to 2035-36.                                          and vehicle operating costs, while boosting regional
        n An integrated framework to accelerate Compressed   mobility and socio-economic development.
           Biogas production through assured procurement,    n The project includes provisions for the construction
           stable pricing, capital support, and pipeline        of 15 major bridges, 30 minor bridges, 19 flyovers,
           connectivity.                                        and an elephant underpass on the Tezpur bypass.
        n A nearly tenfold increase in domestic Compressed   n A 135.87 km long highway will be constructed at a
           Biogas production and strengthening of the country’s   cost of ₹8,970.20 crore.
           energy security.
                                                             n A 4.9 km long emergency landing facility will be
        n A major boost for farmers, rural entrepreneurs,       developed on the Tezpur bypass.
           private investment, ‘waste-to-wealth’ initiatives, and
           ‘Atmanirbhar Bharat’.                             n It will seamlessly connect key economic, social, and
                                                                logistics nodes in Assam and Arunachal Pradesh. n

                      Scan the QR code to watch the press
                      briefing on the Cabinet decisions.
                                                                        Sep 01-15, 2026 || NEW INDIA SAMACHAR   35
   32   33   34   35   36   37   38   39   40   41   42